Site Rehabilitation

Site Rehabilitation includes the following specializations:

The process of cleaning up an industrial site at the end of the plant’s  lifecycle entails numerous phases: asbestos removal, dismantling the installations, soil decontamination and so on.

These activities hold numerous risks for customers (in terms of budget, planning, physical accidents, impact on the environment and health etc.), and must be carried out in accordance with ever-tightening legislation.

We can  help our customers tackle the operations which they are less familiar with and  monitor costs to keep them as low as possible. 

 Contact 

Jan Lecompte
This email address is being protected from spambots. You need JavaScript enabled to view it.This email address is being protected from spambots. You need JavaScript enabled to view it.

 

 

References Site Rehabilitation

Dismantling the Electrabel site in Schel…

Tractebel took on the task of dismantling the Electrabel site in Schelle (Belgium); buildings and installations on the site no longer in operation were to be demolished.   

read more

Dismantling the Amercoeur (Belgium) powe…

The Amercoeur multi-fuel plant, which operates on coal, fuel oil, natural gas and blast furnace gas, comprises two 125 MW monoblock groups. Tractebel installed a new steam gas turbine in...

read more

Filling in the old Kruibeke clay pit

Tractebel carried out the feasibility study for the project and specified the most effective pit filling method. 

read more

Pollution analysis of the former Thuin s…

Tractebel applied 20 depth and pressure measurements to fully investigate and analyse the site pollution

read more

Soil decontamination at Tertre industria…

Tractebel assisted Tertre, a town in Wallonia (Belgium), in decontaminating two former industrial sites filled with toxic waste. The sites were partly submerged in an aquifer and had a limited...

read more

Dismantling the Mol power plant

In 2009 Electrabel shut down its coal and gas plant in Mol (Belgium) and asked Tractebel to carry out a feasibility study on dismantling the entire site.

read more

Dismantling Group 19 at the Langerbrugge…

Electrabel decided to dismantle the Group 19 installation and commissioned Tractebel with a feasibility study on the project. The study also took into account Group 20 and 30 which had...

read more

Feasibility study for dismantling the Ka…

In 2010 Electrabel permanently ended energy production at the Kallo (Belgium) power plant. Tractebel was commissioned with carrying out a feasibility study on dismantling the site, taking into account the...

read more

Soil decontamination and brownfield deve…

In 2008 the city of Ghent decided to convert the former North Dock port area into a multipurpose area for homes, offices, shops and green spaces. But the heavily contaminated...

read more

Supporting soil decontamination operatio…

La Floridienne refuse dump located along the Ghent-Terneuzen Canal used to be one of the most contaminated sites in Flanders. Tractebel supported the clean-up operation of the site so that...

read more

Preparation for dismantling Borzeşti pow…

In 2008 Electrabel commissioned Tractebel with the task of preparing a feasibility study on closing down and dismantling Borzeşti power station in Romania. The presence of asbestos in the power...

read more

Support for soil decontamination operati…

In Asse (Belgium) Tractebel acted as recognised type II soil decontamination expert during the construction of a seal for a refuse dump adjacent to Asphaltco’s former factory site. The soil...

read more